Last Updated: November 10, 2009 4pm
The following construction contracts are currently
out for bids or were recently opened. Although every effort is made
to provide the most current information available, the bid opening
dates shown may be changed by addendum at any time prior to bid opening.
For more information on the project, including how to purchase plans
and specifications, click on the "Notice Inviting Bids"
icon. Contact Metropolitan's Specifications
Desk if you have any questions.
* All PDF documents on this site require Adobe Acrobat Reader 4.0
or higher. If you do not have Adobe Acrobat Reader, or must upgrade
your version, you may download it for free from Adobe's
website. If you are using a dial-up modem, please note that many
of these documents are large in size and take a long time to open.
Use of software other than Adobe Reader may cause discrepancies from
the original documents. These risks will be assumed by the reader.
Out
for Bid
| SPEC
NO. |
PROJECT |
DOWNLOADABLE DOCUMENTS* |
APPROXIMATE
CONSTRUCTION
VALUE |
MANDATORY
PRE-BID CONFERENCE* |
BIDS
OPEN* |
|
1667A
|
Colorado River Aqueduct Pumping Plants - 230kV Line Reactors and 6.9 kV Switch Houses
|
|
$5,500,000 - $6,500,000
|
11/18/2009 10:00 a.m.
|
12/7/2009 2:00 p.m.
|
|
1625
|
Air Release and Vacuum Valve Relocation for Treated Water Pipelines Construction Package 10
|
|
$1,000,000 - $1,300,000
|
11/24/2009 10:00 a.m.
|
12/15/2009 2:00 p.m.
|
|
1652
|
F.E. Weymouth Water Treatment Plant Filter Rehabilitation Demonstration
|
|
$2,600,000 - $3,200,000
|
11/10/2009 10:00 a.m.
|
12/01/2009 2:00 p.m.
|
|
1623
|
Air Release and Vacuum Valve Relocation for Treated Water Pipelines Construction Package 8
|
|
$1,200,000 - $1,500,000
|
11/03/2009 9:00 a.m.
|
11/24/2009 2:00 p.m.
|
|
TBD
|
Upcoming Projects (Click on document at right to download list)
|
|
|
|
|
|
|
|
|
|
|
|
Bid Results
|
SPEC NO. |
PROJECT |
BIDS OPENED |
BID RESULTS |
| 1599 |
Air Release and Vacuum Valve Relocation for Treated Water Pipelines Construction Package 7
|
11/10/2009 |
|
| 1657 |
Lake Skinner Outlet Conduit Repair
|
10/29/2009 |
|
| 1665 |
Iron Mountain Pumping Plant - Delivery Pipe Expansion Joint Repair
|
10/28/2009 |
|
| 1562 |
Colorado River Aqueduct Access Covers and Water Tank Improvements
|
10/21/2009 |
|
| 1628 |
F.E. Weymouth Water Treatment Plant Power System Upgrade
|
10/08/2009 |
|
| M-2954 |
Union Station Two-Way Radio Communications System Enhancement
|
10/07/2009 |
|
| 1629 |
Robert B. Diemer Water Treatment Plant North Access Road
|
09/09/2009 |
|
| 1586B |
Middle Feeder North Cathodic Protection
|
07/29/2009 |
|
|
 |